EnerTek
Prices in KES. Installation quotation prepared free within 24 hours.
Automatic changeover between grid, inverter and generator — seamless transfer in under 40 ms.
ATS 63 A — dual-source automatic transfer switch for grid + inverter/generator, under-voltage protection, 3-phase option.
Site visit, load audit, yield forecast and itemised quotation — free for projects above 5 kW.
Licensed EPRA engineers install and commission every system — no subcontractors, no hidden extras.
10-year workmanship, 25-year panel warranty, 48-hour support SLA and annual maintenance plans.